Services:
- Assembly of Current and Potential Transformer Equipment
- Site Equipment Testing
- Meter Installation
- Communication System Installation
- Control Cable Testing
- CFE Paperwork and Arrangements
- Assembly and laying of 1 km of Aluminum Conductor Steel Reinforced cables (ACSR)
- Transformer Installation
- Measurement niche and branch circuits installation
- Power substation project and design
Assembly of Current and Potential Transformer Equipment
- XLP cable underground set up and installation
- Installation of a 750 kVA capacity transformer
- Installation of a measurement-integrated 13,8 kV line transformer
- Installation of a 24 kV measurement dead-front
Assembly of Current and Potential Transformer
Equipment
Meter Installation
Communication System Installation
CFE Paperwork and Arrangements
-Assembly of current and potential transformer equipment
-Meter installation
-Communication system installation
-CFE paperwork and arrangements
-Delivery of the main network
-Easement paperwork
Calle D #351 A Colonia Nueva,Mexicali, Baja California,CP 21100
686 122 2473686 144 28 79686 121 65 22
ventas@sinergy-solutions.com
© 2024 Sinergy Solutions. All rights reserved. Design by @zimmamarketing